Site records

Work taking shape, documented as it stands

Photographs from active and completed formwork, shown without retouching. Each frame records framing, alignment, and site conditions as they were on the day of the pour.

Site standards

Every panel is checked against the drawings for alignment and tolerance before the pour, and every site is kept clean enough to inspect.— Superb Formworks site practice